Sustainable & sympathetic design
principles are embedded into each project

News

Dorcas Lane Planning Application Dec 2011 Back

Force 9 Energy has submitted a planning application to Aylesbury Vale District Council for a four turbine wind farm at Dorcas Lane. Each turbine would have a maximum height of 125 m to blade tip in the vertical position and have a maximum installed capacity of 2.5MW of electricity. To view the full list of submission documents please see the Dorcas Lane website.