Sustainable & sympathetic design
principles are embedded into each project

Cnoc An Eas

Site Statistics

Location
Highland Council - west of Drumnadrochit and on the north side of Glen Urquhart, above Loch Meiklie.
Status
Scoped with Highland Council.
Proposed Turbines
13 turbines
Houses powered
21,475*

Force 9 Energy has identified an area approximately 9km west of Drumnadrochit as a potential wind farm site and is due to submit a planning application at the end of April with the Highland Council.

In addition to the turbines, the wind farm will include a sub-station, meteorological mast and access tracks.


*Please note that this figure is based on 13 turbines with a rated capacity of 3MW operating at 26.35% capacity (long term average capacity factor for onshore wind from Digest of UK Energy Statistics) and assuming 4,192 is the average UK household electricity consumption in kW hours (based on DECCs publication URN:12D/468).